Bishop McNamara High School

Forestville, MD 66,000 SF
About The Project

The project was a phased renovation and addition to an existing high school that was completed while the school was fully occupied. The project consisted of 10,106 sq ft of additions and approximately 56,000 sq ft of renovation. The renovations consisted of an administration area, classrooms, cafeteria, bathrooms, and lobby area. The additions consisted of a Chapel, library, elevator, dance studio, and band room. The band room and dance studio were built utilizing a portion of a large existing interior courtyard space. A re-designed front entrance was also included as a part of this project.

Owner
Bishop McNamara High School
Architect
DeLizzio Architects