SMECO Southern Regional Facility

Leonardtown, MD
68,500 SF

About the Project

Preconstruction and construction services for a single story office building, operations center, and data center attached to a singe story pre-engineered metal building structure for the materials warehouse, truck parking bay, and wash bay. Phase 1 included construction of the new building and associated sitework/utilities, as well as a new fuel station. Phase 2 consists of demolition of their existing facility and completion of storm water management devices.

Owner: Southern Maryland Energy Cooperation (SMECO)
Architect: Lawrence Abell & Associates
Awards:

Associated Builders and Contractors Chesapeake Shores Excellence in Construction

Varco Pruden Hall of Fame 2022

Project photo

“Throughout pre-construction, Scheibel played a vital role in driving the design team to meet the Owner’s functional requirements while minimizing overall project costs. The value engineering provided during pre-construction afforded SMECO the opportunity to carefully select systems, equipment, and construction materials to meet the Owner requirements at the best overall value.”

Ryan SchlotterbeckProject Manager, Southern Maryland Electric Cooperative (SMECO)